Panel on Risk & Performance Analysis - May 16-17, 1989
May 16-17, 1989
Washington, DC
Topics:
Washington, DC
Topics:
- Need for Adequate Testing
- Performance Assessment
- Agenda - May 16-17, 1989 (pdf - 41KB)
- May 16, 1989 Transcript (pdf - 398KB)
- May 17, 1989 Transcript (pdf - 287KB)
- Donald Alexander, OCRWM; Overview of Performance Assessments (pdf - 3.4MB)
- Larry Rickertsen, OCRWM; Flowdown of Regulatory Requirements to the Performance Assessment Program (pdf - 1.1MB)
- Paul Gnirk, RE/SPEC Inc.; Technical Integration of Performance Assessment Program (pdf - 234KB)
- Dwight Hoxie, USGS; Performance of Natural Barriers (pdf - 871KB)
- Abraham Van Luik, Pacific Northwest Laboratory; Engineered Barrier System Performance (pdf - 745KB)
- Felton Bingham, SNL; Total-System Performance Assessment (pdf - 865KB)
- David Michlewicz, OCRWM; Preclosure Safety Assessment (pdf - 370KB)
- Charles Voss, Battelle Pacific Northwest Laboratories; Methodology for Validation of Models (pdf - 557KB)
- Maxwell Blanchard, DOE; Linkage for Performance Assessment to the Site Program (pdf - 493KB)
- M. J. Apted, Battelle Pacific Northwest Laboratory; Pass Program (pdf - 870KB)
- Paul Gnirk, RE/SPEC INC.,; Performance Assessment of Yucca Mountain in Support of the Comparative Site Analysis (pdf - 790KB)
- Felton Bingham, SNL; Potential Impacts of Exploratory-Shaft Facility (ESF) on Waste Isolation (pdf - 549KB)
- Thomas Pigford, University of California; Models of Waste Package Behavior in a Repository Environment (pdf - 1.4MB)
- Jean Younker, DOE; Role of Performance Assessment in Prioritization of Site Characterization Program (pdf - 758KB)